
{"id":261895,"date":"2022-12-11T08:11:30","date_gmt":"2022-12-11T13:11:30","guid":{"rendered":"https:\/\/oncubanews.com\/en\/?p=261895"},"modified":"2022-12-11T08:16:32","modified_gmt":"2022-12-11T13:16:32","slug":"work-begins-install-underwater-cable-linking-cuba","status":"publish","type":"post","link":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/","title":{"rendered":"Work begins to install underwater cable linking Cuba with Martinique"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The connection of the Arimao underwater cable, which <\/span><a href=\"https:\/\/oncubanews.com\/tag\/internet-en-cuba\/\" target=\"_blank\" rel=\"noopener\"><b>will link Cuba<\/b><\/a><span style=\"font-weight: 400;\"> with Martinique, began this Thursday in the Tricontinental Port of Cienfuegos, according to the official newspaper <\/span><i><span style=\"font-weight: 400;\">Granma<\/span><\/i><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The signing of the agreement between the <\/span><a href=\"https:\/\/oncubanews.com\/tag\/empresa-de-telecomunicaciones-de-cuba-etecsa\/\" target=\"_blank\" rel=\"noopener\"><b>Cuban Telecommunications Company S.A.<\/b><\/a><span style=\"font-weight: 400;\"> (ETECSA) and the French company Orange S.A. marked the beginning of the technological operation for which the cable ship <\/span><i><span style=\"font-weight: 400;\">Pierre de Fermat<\/span><\/i><span style=\"font-weight: 400;\"> was already on the island, which, according to the information available, had arrived in Cienfuegos on the 7th from Fort de France, Martinique.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The cable is 2,500 kilometers long and once loaded on the ship will begin the installation process, which would last a few weeks. Jean-Luc Vuillemin, president of Redes Internacionales de Orange S.A., pointed out that, in parallel, the construction of a station that will house the technical services was carried out.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For Orange S.A. the process of connecting an underwater cable is preceded by studies carried out by an oceanographic vessel. It maps the seabed in different routes and from there they design the cable and order it from the manufacturers, according to <\/span><a href=\"https:\/\/outremers360.com\/economie\/les-cables-sous-marins-numeriques-sont-la-materialisation-dun-flux-dechange-qui-existe-deja-dans-dautres-facons-explique-jean-luc-vuillemin\" target=\"_blank\" rel=\"noopener\"><b>statements<\/b><\/a><span style=\"font-weight: 400;\">\u00a0by Vuillemin to <\/span><i><span style=\"font-weight: 400;\">Outremers360<\/span><\/i><span style=\"font-weight: 400;\"> in 2019, after the French company worked on a project that linked Guyana with Martinique.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cOnce done, we have to lay the cable, and for this we have a special tool that is a fleet of ships grouped in a company called Orange Marine,\u201d he said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Due to the complications it brings to the environment, the Cuban authorities point out that the protection of the marine ecosystem will be taken into account at the Arimao facility to avoid affecting areas with large concentrations of plants and the spawning periods of leatherback turtles (Dermochelys coriacea).<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cIt is an infrastructure that has good service availability in general. But it is an infrastructure that lies on the seabed along thousands of kilometers without any particular surveillance. Cables are inevitably uprooted by anchors, trawls, underwater earthquakes, etc. That is why at least two cables are needed. With one cable, the situation is not satisfactory, it is when you have two that you start to breathe. Three cables is even better,\u201d said Luc Vuillemin in the aforementioned interview.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Cuban Deputy Prime Minister Jorge Luis Perdomo told <\/span><i><span style=\"font-weight: 400;\">Granma<\/span><\/i><span style=\"font-weight: 400;\"> that the Arimao project is a sign of the government\u2019s will to continue expanding the international communications system of the archipelago, in order to advance in the process of computerization and digital transformation of society. The capacity or cost of the cable has not been disclosed.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Perdomo added that, among the benefits of this project, is the diversification of the country\u2019s international connectivity, and stressed that the realization of Arimao will complement what is currently achieved through a single route of this type in the country: the ALBA-1 system, fruit of joint work with Venezuela.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Cuban Minister of Communications Mayra Arevich Mar\u00edn stressed that Arimao \u201cis a dream come true, it contributes to the compliance of the National Economic and Social Development Plan until 2030 and will offer Cubans more and better connectivity.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The event occurs shortly after the U.S. government urged the Federal Communications Commission to <\/span><a href=\"https:\/\/oncubanews.com\/cuba-ee-uu\/justicia-estadounidense-recomienda-impedir-que-un-cable-submarino-conecte-eeuu-con-cuba\/\" target=\"_blank\" rel=\"noopener\"><b>deny a request<\/b><\/a><span style=\"font-weight: 400;\"> to establish a connection between Cuba and the United States.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The signing of the agreement between the Cuban Telecommunications Company S.A. (ETECSA) and the French company Orange S.A. marked the start of the technological operation.<\/p>\n","protected":false},"author":3134,"featured_media":261897,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[13902],"tags":[4658],"ppma_author":[33546],"class_list":["post-261895","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cuba","tag-internet-in-cuba"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Work begins to install underwater cable linking Cuba with Martinique | OnCubaNews English<\/title>\n<meta name=\"description\" content=\"The connection of the Arimao underwater cable, which will link Cuba with Martinique.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Work begins to install underwater cable linking Cuba with Martinique | OnCubaNews English\" \/>\n<meta property=\"og:description\" content=\"The connection of the Arimao underwater cable, which will link Cuba with Martinique.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/\" \/>\n<meta property=\"og:site_name\" content=\"OnCubaNews English\" \/>\n<meta property=\"article:published_time\" content=\"2022-12-11T13:11:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-11T13:16:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2022\/12\/internet-cuba-cable-submarino-750x422-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"422\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"OnCuba Staff\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"OnCuba Staff\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/work-begins-install-underwater-cable-linking-cuba\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/work-begins-install-underwater-cable-linking-cuba\\\/\"},\"author\":{\"name\":\"OnCuba Staff\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/#\\\/schema\\\/person\\\/d7171bf311032ab1f557dd8332e714af\"},\"headline\":\"Work begins to install underwater cable linking Cuba with Martinique\",\"datePublished\":\"2022-12-11T13:11:30+00:00\",\"dateModified\":\"2022-12-11T13:16:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/work-begins-install-underwater-cable-linking-cuba\\\/\"},\"wordCount\":539,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/work-begins-install-underwater-cable-linking-cuba\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/internet-cuba-cable-submarino-750x422-1.jpg\",\"keywords\":[\"Internet in Cuba\"],\"articleSection\":[\"Cuba\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/work-begins-install-underwater-cable-linking-cuba\\\/#respond\"]}],\"copyrightYear\":\"2022\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/work-begins-install-underwater-cable-linking-cuba\\\/\",\"url\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/work-begins-install-underwater-cable-linking-cuba\\\/\",\"name\":\"Work begins to install underwater cable linking Cuba with Martinique | OnCubaNews English\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/work-begins-install-underwater-cable-linking-cuba\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/work-begins-install-underwater-cable-linking-cuba\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/internet-cuba-cable-submarino-750x422-1.jpg\",\"datePublished\":\"2022-12-11T13:11:30+00:00\",\"dateModified\":\"2022-12-11T13:16:32+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/#\\\/schema\\\/person\\\/d7171bf311032ab1f557dd8332e714af\"},\"description\":\"The connection of the Arimao underwater cable, which will link Cuba with Martinique.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/work-begins-install-underwater-cable-linking-cuba\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/work-begins-install-underwater-cable-linking-cuba\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/work-begins-install-underwater-cable-linking-cuba\\\/#primaryimage\",\"url\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/internet-cuba-cable-submarino-750x422-1.jpg\",\"contentUrl\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/internet-cuba-cable-submarino-750x422-1.jpg\",\"width\":750,\"height\":422,\"caption\":\"Tania Vel\u00e1zquez Rodr\u00edguez, president of ETECSA, thanked the French multinational for the spirit of cooperation. Photo: DANIELLA P\u00c9REZ MU\u00d1OA\\\/ACN.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/work-begins-install-underwater-cable-linking-cuba\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Work begins to install underwater cable linking Cuba with Martinique\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/\",\"name\":\"OnCubaNews English\",\"description\":\"Revista sobre Cuba\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/#\\\/schema\\\/person\\\/d7171bf311032ab1f557dd8332e714af\",\"name\":\"OnCuba Staff\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4b4c4d6109baadde898bb1af22ea4a4af5f4417b86a5d1800bf17531bfb128fc?s=96&r=g17310096d4dde63ebae0e54fbb19218a\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4b4c4d6109baadde898bb1af22ea4a4af5f4417b86a5d1800bf17531bfb128fc?s=96&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4b4c4d6109baadde898bb1af22ea4a4af5f4417b86a5d1800bf17531bfb128fc?s=96&r=g\",\"caption\":\"OnCuba Staff\"},\"url\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/author\\\/oncuba-editorial-staff\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Work begins to install underwater cable linking Cuba with Martinique | OnCubaNews English","description":"The connection of the Arimao underwater cable, which will link Cuba with Martinique.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/","og_locale":"en_US","og_type":"article","og_title":"Work begins to install underwater cable linking Cuba with Martinique | OnCubaNews English","og_description":"The connection of the Arimao underwater cable, which will link Cuba with Martinique.","og_url":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/","og_site_name":"OnCubaNews English","article_published_time":"2022-12-11T13:11:30+00:00","article_modified_time":"2022-12-11T13:16:32+00:00","og_image":[{"width":750,"height":422,"url":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2022\/12\/internet-cuba-cable-submarino-750x422-1.jpg","type":"image\/jpeg"}],"author":"OnCuba Staff","twitter_card":"summary_large_image","twitter_misc":{"Written by":"OnCuba Staff","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/#article","isPartOf":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/"},"author":{"name":"OnCuba Staff","@id":"https:\/\/oncubanews.com\/en\/#\/schema\/person\/d7171bf311032ab1f557dd8332e714af"},"headline":"Work begins to install underwater cable linking Cuba with Martinique","datePublished":"2022-12-11T13:11:30+00:00","dateModified":"2022-12-11T13:16:32+00:00","mainEntityOfPage":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/"},"wordCount":539,"commentCount":0,"image":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/#primaryimage"},"thumbnailUrl":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2022\/12\/internet-cuba-cable-submarino-750x422-1.jpg","keywords":["Internet in Cuba"],"articleSection":["Cuba"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/#respond"]}],"copyrightYear":"2022","copyrightHolder":{"@id":"https:\/\/oncubanews.com\/en\/#organization"}},{"@type":"WebPage","@id":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/","url":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/","name":"Work begins to install underwater cable linking Cuba with Martinique | OnCubaNews English","isPartOf":{"@id":"https:\/\/oncubanews.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/#primaryimage"},"image":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/#primaryimage"},"thumbnailUrl":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2022\/12\/internet-cuba-cable-submarino-750x422-1.jpg","datePublished":"2022-12-11T13:11:30+00:00","dateModified":"2022-12-11T13:16:32+00:00","author":{"@id":"https:\/\/oncubanews.com\/en\/#\/schema\/person\/d7171bf311032ab1f557dd8332e714af"},"description":"The connection of the Arimao underwater cable, which will link Cuba with Martinique.","breadcrumb":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/#primaryimage","url":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2022\/12\/internet-cuba-cable-submarino-750x422-1.jpg","contentUrl":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2022\/12\/internet-cuba-cable-submarino-750x422-1.jpg","width":750,"height":422,"caption":"Tania Vel\u00e1zquez Rodr\u00edguez, president of ETECSA, thanked the French multinational for the spirit of cooperation. Photo: DANIELLA P\u00c9REZ MU\u00d1OA\/ACN."},{"@type":"BreadcrumbList","@id":"https:\/\/oncubanews.com\/en\/cuba\/work-begins-install-underwater-cable-linking-cuba\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/oncubanews.com\/en\/"},{"@type":"ListItem","position":2,"name":"Work begins to install underwater cable linking Cuba with Martinique"}]},{"@type":"WebSite","@id":"https:\/\/oncubanews.com\/en\/#website","url":"https:\/\/oncubanews.com\/en\/","name":"OnCubaNews English","description":"Revista sobre Cuba","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/oncubanews.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/oncubanews.com\/en\/#\/schema\/person\/d7171bf311032ab1f557dd8332e714af","name":"OnCuba Staff","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/4b4c4d6109baadde898bb1af22ea4a4af5f4417b86a5d1800bf17531bfb128fc?s=96&r=g17310096d4dde63ebae0e54fbb19218a","url":"https:\/\/secure.gravatar.com\/avatar\/4b4c4d6109baadde898bb1af22ea4a4af5f4417b86a5d1800bf17531bfb128fc?s=96&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4b4c4d6109baadde898bb1af22ea4a4af5f4417b86a5d1800bf17531bfb128fc?s=96&r=g","caption":"OnCuba Staff"},"url":"https:\/\/oncubanews.com\/en\/author\/oncuba-editorial-staff\/"}]}},"authors":[{"term_id":33546,"user_id":3134,"is_guest":0,"slug":"oncuba-editorial-staff","display_name":"OnCuba Staff","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/4b4c4d6109baadde898bb1af22ea4a4af5f4417b86a5d1800bf17531bfb128fc?s=96&r=g","0":null,"1":"","2":"","3":"","4":"","5":"","6":"","7":"","8":""}],"_links":{"self":[{"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/posts\/261895","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/users\/3134"}],"replies":[{"embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/comments?post=261895"}],"version-history":[{"count":2,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/posts\/261895\/revisions"}],"predecessor-version":[{"id":261896,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/posts\/261895\/revisions\/261896"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/media\/261897"}],"wp:attachment":[{"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/media?parent=261895"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/categories?post=261895"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/tags?post=261895"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/ppma_author?post=261895"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}