
{"id":318691,"date":"2025-02-24T18:10:33","date_gmt":"2025-02-24T23:10:33","guid":{"rendered":"https:\/\/oncubanews.com\/en\/?p=318691"},"modified":"2025-02-24T18:10:33","modified_gmt":"2025-02-24T23:10:33","slug":"first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba","status":"publish","type":"post","link":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/","title":{"rendered":"First solar park connected in project to curb energy crisis in Cuba"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The first of the 55 <\/span><a href=\"https:\/\/oncubanews.com\/en\/tag\/renewable-energy-sources\" target=\"_blank\" rel=\"noopener\"><b>photovoltaic generation<\/b><\/a><span style=\"font-weight: 400;\"> parks that will be installed this year in Cuba synchronized this Thursday with the National Electric Power System (SEN), to which it must provide 21.8 megawatts (MW) in the midst of the\u00a0<\/span><span style=\"font-weight: 400;\"><span style=\"box-sizing: border-box; margin: 0px; padding: 0px;\">country&#8217;s <a href=\"https:\/\/oncubanews.com\/tag\/generacion-electrica\/\">energy crisis<\/a><\/span>.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Escuela de Enfermer\u00eda facility, located in the Havana municipality of Cotorro, is part of a project designed as a strategy to recover a system incapable of increasing electricity demand, due to the continuous breakdowns of its old and overexploited thermoelectric plants, and the lack of the fuel necessary for the operation of the distributed generation engines.<\/span><\/p>\n<blockquote class=\"twitter-tweet\">\n<p dir=\"ltr\" lang=\"es\">Ya sincronizado Parque Solar Fotovoltaico, Escuela de Enfermer\u00eda del Cotorro en <a href=\"https:\/\/twitter.com\/hashtag\/LaHabana?src=hash&amp;ref_src=twsrc%5Etfw\">#LaHabana<\/a> primero de los 92 del nuevo proceso inversionista.<br \/>\nLa recuperaci\u00f3n del SEN  primera prioridad.<br \/>\nLa pr\u00f3xima semana estaremos inaugurando otro parque similar a este.<a href=\"https:\/\/twitter.com\/hashtag\/UnidosXCuba?src=hash&amp;ref_src=twsrc%5Etfw\">#UnidosXCuba<\/a> Venceremos! <a href=\"https:\/\/t.co\/LkDqChVlfH\">pic.twitter.com\/LkDqChVlfH<\/a><\/p>\n<p>\u2014 Ministerio de Energ\u00eda y Minas de Cuba  (@EnergiaMinasCub) <a href=\"https:\/\/twitter.com\/EnergiaMinasCub\/status\/1892923243905819020?ref_src=twsrc%5Etfw\">February 21, 2025<\/a><\/p><\/blockquote>\n<p><script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><\/p>\n<p><span style=\"font-weight: 400;\">The park should provide around 37 gigawatts\/hour annually, which would allow the saving of some 8,100 tons of diesel used for generation, according to the projections of specialists, <\/span><a href=\"http:\/\/www.cubadebate.cu\/noticias\/2025\/02\/21\/sincroniza-escuela-de-enfermeria-primer-parque-solar-fotovoltaico-de-21-8-mw\/\" target=\"_blank\" rel=\"noopener\"><b>cited<\/b><\/a><span style=\"font-weight: 400;\">\u00a0by the <\/span><i><span style=\"font-weight: 400;\">Cubadebate<\/span><\/i><span style=\"font-weight: 400;\"> website.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Ricardo Mangana, director of the Renewable Energy Sources Enterprise (EMFRE), told the media that the site had begun to generate using sunlight as a source since last Monday and that it had reached a maximum power of 21.7 a day before its official opening.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The park is operated by 31 engineers and qualified workers, according to the website of the Presidency.<\/span><\/p>\n<p><b>98 photovoltaic parks until 2028<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The strategy proposed by the Cuban government to overcome the prolonged and acute energy crisis includes the installation of 98 photovoltaic parks until 2028, with <\/span><a href=\"https:\/\/oncubanews.com\/cuba\/economia\/cuba-y-china-firman-proyecto-de-inversion-para-instalar-pequenos-parques-fotovoltaicos\" target=\"_blank\" rel=\"noopener\"><b>supplies and advice from China;<\/b><\/a><span style=\"font-weight: 400;\"> together, they would have the capacity to contribute around 2,000 MW to the SEN.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This program seeks to recover generation capacities in a faster and less costly way. Independent calculations, handled by the EFE news agency, establish that the Cuban government would need between 8 and 10 billion dollars to refloat the SEN, an investment beyond its reach.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">With this initiative, the aim is to cushion the impact of the tortuous blackouts that have gradually worsened until reaching a new record last week, when only 43% of the demand could be met.<\/span><\/p>\n<p><b>High deficits in the week<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The critical situation continues with slight variations, and throughout this Thursday the service was affected.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Electric Union (UNE) calculated for the maximum demand time of this Friday a real affectation of around 1,564 MW.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Two thermoelectric plants without generating, due to breakdowns, and four stopped for maintenance hinder the capacity of the SEN to cover a good part of the 3,250 MW that clients would demand in that time slot.<\/span><\/p>\n<p><iframe loading=\"lazy\" style=\"border: none; overflow: hidden;\" src=\"https:\/\/www.facebook.com\/plugins\/post.php?href=https%3A%2F%2Fwww.facebook.com%2FUnionElectricaOficinaCentral%2Fposts%2Fpfbid02YJh8HKb8fNEF1BQAma7qEdmtRjJJmMaExDb19u73ipCxmgwMVhyHN9xXko4W3EXl&amp;show_text=true&amp;width=500\" width=\"500\" height=\"277\" frameborder=\"0\" scrolling=\"no\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n<p><span style=\"font-weight: 400;\">The critical situation is also influenced by the fact that 77 distributed generation plants, with the capacity to supply 418 MW, do not have fuel for their operation. The number has increased during the day.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The frequent power outages have had a significant impact on the Cuban economy, which contracted by 1.9% in 2023 and did not grow last year, according to official statistics.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With technology and advice from China, the site would have the capacity to provide 21.8 megawatts to the National Electric Power System. The government intends to finish 55 of these parks in 2025.<\/p>\n","protected":false},"author":3134,"featured_media":318693,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[13902],"tags":[29161,34103],"ppma_author":[33546],"class_list":["post-318691","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cuba","tag-energy-crisis-in-cuba","tag-renewable-energy-sources"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>First solar park connected in project to curb energy crisis in Cuba | OnCubaNews English<\/title>\n<meta name=\"description\" content=\"With technology and advice from China, the site would have the capacity to provide 21.8 megawatts to the National Electric Power System. The government intends to finish 55 of these parks in 2025.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"First solar park connected in project to curb energy crisis in Cuba | OnCubaNews English\" \/>\n<meta property=\"og:description\" content=\"With technology and advice from China, the site would have the capacity to provide 21.8 megawatts to the National Electric Power System. The government intends to finish 55 of these parks in 2025.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/\" \/>\n<meta property=\"og:site_name\" content=\"OnCubaNews English\" \/>\n<meta property=\"article:published_time\" content=\"2025-02-24T23:10:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/02\/generacion-electricidad-la-habana-cotorro-paneles-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1345\" \/>\n\t<meta property=\"og:image:height\" content=\"756\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"OnCuba Staff\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"OnCuba Staff\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/\"},\"author\":{\"name\":\"OnCuba Staff\",\"@id\":\"https:\/\/oncubanews.com\/en\/#\/schema\/person\/d7171bf311032ab1f557dd8332e714af\"},\"headline\":\"First solar park connected in project to curb energy crisis in Cuba\",\"datePublished\":\"2025-02-24T23:10:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/\"},\"wordCount\":508,\"commentCount\":1,\"image\":{\"@id\":\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/02\/generacion-electricidad-la-habana-cotorro-paneles-1.jpg\",\"keywords\":[\"energy crisis in Cuba\",\"Renewable Energy Sources\"],\"articleSection\":[\"Cuba\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#respond\"]}],\"copyrightYear\":\"2025\",\"copyrightHolder\":{\"@id\":\"https:\/\/oncubanews.com\/en\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/\",\"url\":\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/\",\"name\":\"First solar park connected in project to curb energy crisis in Cuba | OnCubaNews English\",\"isPartOf\":{\"@id\":\"https:\/\/oncubanews.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/02\/generacion-electricidad-la-habana-cotorro-paneles-1.jpg\",\"datePublished\":\"2025-02-24T23:10:33+00:00\",\"author\":{\"@id\":\"https:\/\/oncubanews.com\/en\/#\/schema\/person\/d7171bf311032ab1f557dd8332e714af\"},\"description\":\"With technology and advice from China, the site would have the capacity to provide 21.8 megawatts to the National Electric Power System. The government intends to finish 55 of these parks in 2025.\",\"breadcrumb\":{\"@id\":\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#primaryimage\",\"url\":\"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/02\/generacion-electricidad-la-habana-cotorro-paneles-1.jpg\",\"contentUrl\":\"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/02\/generacion-electricidad-la-habana-cotorro-paneles-1.jpg\",\"width\":1345,\"height\":756,\"caption\":\"It must provide around 37 gigawatts\/hour annually. Photo: @PresidenciaCuba\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/oncubanews.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"First solar park connected in project to curb energy crisis in Cuba\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/oncubanews.com\/en\/#website\",\"url\":\"https:\/\/oncubanews.com\/en\/\",\"name\":\"OnCubaNews English\",\"description\":\"Revista sobre Cuba\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/oncubanews.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/oncubanews.com\/en\/#\/schema\/person\/d7171bf311032ab1f557dd8332e714af\",\"name\":\"OnCuba Staff\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/oncubanews.com\/en\/#\/schema\/person\/image\/17310096d4dde63ebae0e54fbb19218a\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/4b4c4d6109baadde898bb1af22ea4a4af5f4417b86a5d1800bf17531bfb128fc?s=96&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/4b4c4d6109baadde898bb1af22ea4a4af5f4417b86a5d1800bf17531bfb128fc?s=96&r=g\",\"caption\":\"OnCuba Staff\"},\"url\":\"https:\/\/oncubanews.com\/en\/author\/oncuba-editorial-staff\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"First solar park connected in project to curb energy crisis in Cuba | OnCubaNews English","description":"With technology and advice from China, the site would have the capacity to provide 21.8 megawatts to the National Electric Power System. The government intends to finish 55 of these parks in 2025.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/","og_locale":"en_US","og_type":"article","og_title":"First solar park connected in project to curb energy crisis in Cuba | OnCubaNews English","og_description":"With technology and advice from China, the site would have the capacity to provide 21.8 megawatts to the National Electric Power System. The government intends to finish 55 of these parks in 2025.","og_url":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/","og_site_name":"OnCubaNews English","article_published_time":"2025-02-24T23:10:33+00:00","og_image":[{"width":1345,"height":756,"url":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/02\/generacion-electricidad-la-habana-cotorro-paneles-1.jpg","type":"image\/jpeg"}],"author":"OnCuba Staff","twitter_card":"summary_large_image","twitter_misc":{"Written by":"OnCuba Staff","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#article","isPartOf":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/"},"author":{"name":"OnCuba Staff","@id":"https:\/\/oncubanews.com\/en\/#\/schema\/person\/d7171bf311032ab1f557dd8332e714af"},"headline":"First solar park connected in project to curb energy crisis in Cuba","datePublished":"2025-02-24T23:10:33+00:00","mainEntityOfPage":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/"},"wordCount":508,"commentCount":1,"image":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#primaryimage"},"thumbnailUrl":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/02\/generacion-electricidad-la-habana-cotorro-paneles-1.jpg","keywords":["energy crisis in Cuba","Renewable Energy Sources"],"articleSection":["Cuba"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#respond"]}],"copyrightYear":"2025","copyrightHolder":{"@id":"https:\/\/oncubanews.com\/en\/#organization"}},{"@type":"WebPage","@id":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/","url":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/","name":"First solar park connected in project to curb energy crisis in Cuba | OnCubaNews English","isPartOf":{"@id":"https:\/\/oncubanews.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#primaryimage"},"image":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#primaryimage"},"thumbnailUrl":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/02\/generacion-electricidad-la-habana-cotorro-paneles-1.jpg","datePublished":"2025-02-24T23:10:33+00:00","author":{"@id":"https:\/\/oncubanews.com\/en\/#\/schema\/person\/d7171bf311032ab1f557dd8332e714af"},"description":"With technology and advice from China, the site would have the capacity to provide 21.8 megawatts to the National Electric Power System. The government intends to finish 55 of these parks in 2025.","breadcrumb":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#primaryimage","url":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/02\/generacion-electricidad-la-habana-cotorro-paneles-1.jpg","contentUrl":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/02\/generacion-electricidad-la-habana-cotorro-paneles-1.jpg","width":1345,"height":756,"caption":"It must provide around 37 gigawatts\/hour annually. Photo: @PresidenciaCuba"},{"@type":"BreadcrumbList","@id":"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/oncubanews.com\/en\/"},{"@type":"ListItem","position":2,"name":"First solar park connected in project to curb energy crisis in Cuba"}]},{"@type":"WebSite","@id":"https:\/\/oncubanews.com\/en\/#website","url":"https:\/\/oncubanews.com\/en\/","name":"OnCubaNews English","description":"Revista sobre Cuba","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/oncubanews.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/oncubanews.com\/en\/#\/schema\/person\/d7171bf311032ab1f557dd8332e714af","name":"OnCuba Staff","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/oncubanews.com\/en\/#\/schema\/person\/image\/17310096d4dde63ebae0e54fbb19218a","url":"https:\/\/secure.gravatar.com\/avatar\/4b4c4d6109baadde898bb1af22ea4a4af5f4417b86a5d1800bf17531bfb128fc?s=96&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4b4c4d6109baadde898bb1af22ea4a4af5f4417b86a5d1800bf17531bfb128fc?s=96&r=g","caption":"OnCuba Staff"},"url":"https:\/\/oncubanews.com\/en\/author\/oncuba-editorial-staff\/"}]}},"authors":[{"term_id":33546,"user_id":3134,"is_guest":0,"slug":"oncuba-editorial-staff","display_name":"OnCuba Staff","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/4b4c4d6109baadde898bb1af22ea4a4af5f4417b86a5d1800bf17531bfb128fc?s=96&r=g","0":null,"1":"","2":"","3":"","4":"","5":"","6":"","7":"","8":""}],"_links":{"self":[{"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/posts\/318691","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/users\/3134"}],"replies":[{"embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/comments?post=318691"}],"version-history":[{"count":2,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/posts\/318691\/revisions"}],"predecessor-version":[{"id":318695,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/posts\/318691\/revisions\/318695"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/media\/318693"}],"wp:attachment":[{"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/media?parent=318691"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/categories?post=318691"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/tags?post=318691"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/ppma_author?post=318691"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}