
{"id":321157,"date":"2025-04-13T18:18:59","date_gmt":"2025-04-13T22:18:59","guid":{"rendered":"https:\/\/oncubanews.com\/en\/?p=321157"},"modified":"2025-04-13T18:18:59","modified_gmt":"2025-04-13T22:18:59","slug":"solar-parks-vs-blackouts-between-illusions-and-reality-i","status":"publish","type":"post","link":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/","title":{"rendered":"Solar parks vs. blackouts: between illusions and reality (I)"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Cuba\u2019s new solar parks are in the public eye. These installations, presented with great fanfare by authorities and official media, are currently causing questioning and dissatisfaction among the people amid the island\u2019s prolonged <\/span><a href=\"https:\/\/oncubanews.com\/en\/tag\/energy-crisis-in-cuba\/\" target=\"_blank\" rel=\"noopener\"><b>energy crisis<\/b><\/a><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">And with good reason. The announcement of this important investment and, above all, the long-awaited launch of the first parks, raised the expectations of a population that for months has been suffering endless <\/span><a href=\"https:\/\/oncubanews.com\/en\/tag\/blackouts-in-cuba\" target=\"_blank\" rel=\"noopener\"><b>blackouts<\/b><\/a><span style=\"font-weight: 400;\">, which, moreover, are severely punishing the depressed Cuban economy.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, with the fourth month of 2025 ticking away on the calendar and eight of the new photovoltaic panel installations already operational, those expectations are far from being met. Power outages continue to be rampant on the island, with 20 or more consecutive hours of blackouts in many places.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The situation is such that authorities have been forced to temper their optimism and dampen public expectations, with explanations in which they have emphasized the now irreplaceable role of the long-standing thermoelectric plants and have once again pointed to U.S. sanctions as the \u201cmain cause\u201d of the crisis.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">What does the new solar park project currently underway consist of? What is its real impact on Cuba\u2019s electric power system? Are these parks the desired solution to the blackouts? We will attempt to answer these questions based on what has been said so far by officials and official media.<\/span><\/p>\n<blockquote class=\"wp-embedded-content\" data-secret=\"flyOegBotO\"><p><a href=\"https:\/\/oncubanews.com\/cuba\/economia\/parques-fotovoltaicos-un-remiendo-rumbo-a-la-solucion-de-una-crisis\/\">Parques fotovoltaicos: Un remiendo rumbo a la soluci\u00f3n de una crisis<\/a><\/p><\/blockquote>\n<p><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"\u00abParques fotovoltaicos: Un remiendo rumbo a la soluci\u00f3n de una crisis\u00bb \u2014 OnCubaNews\" src=\"https:\/\/oncubanews.com\/cuba\/economia\/parques-fotovoltaicos-un-remiendo-rumbo-a-la-solucion-de-una-crisis\/embed\/#?secret=smphPEyhVE#?secret=flyOegBotO\" data-secret=\"flyOegBotO\" width=\"500\" height=\"282\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe><\/p>\n<p><b>The project: how and until when?<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The installation of the new solar parks was announced a year ago by Minister of Energy and Mines Vicente de la O Levy. At the time, the official explained that it consisted of two contracts with Chinese companies, which together would gradually contribute more than 2,000 MW to the electric power system (SEN).<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These agreements, De la O <\/span><a href=\"https:\/\/www.prensa-latina.cu\/2024\/03\/13\/cuba-busca-soluciones-propias-para-aliviar-sistema-electroenergetico\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">explained<\/span><\/a><span style=\"font-weight: 400;\">\u00a0to <\/span><i><span style=\"font-weight: 400;\">Prensa Latina<\/span><\/i><span style=\"font-weight: 400;\"> (PL) news agency, contemplated the installation of 46 solar parks each, approximately three in each province. The sum of the two provides a total of 92 new parks, whose completion dates were planned \u2014 according to the official report at the time \u2014 for May 2025 and 2028. Each of them, as explained, has a capacity of 21.8 MW.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, while the final number of these parks has remained unchanged in official reports, the dates have changed. <\/span><a href=\"http:\/\/www.cubadebate.cu\/noticias\/2024\/09\/04\/situacion-actual-y-futura-de-le-generacion-electrica-en-cuba-el-ministro-responde-en-la-mesa-redonda\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">In September<\/span><\/a><span style=\"font-weight: 400;\">, Rosell Guerra, director of renewable energy at the Ministry of Energy and Mines (MINEM), stated that work was already underway at some 30 locations and that the goal was to install 10 of these parks by the end of 2024, equivalent to approximately 220 MW. We now know that this did not happen.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Just a month later, the director general of the Electricity Conglomerate (UNE), Alfredo L\u00f3pez, in <\/span><a href=\"https:\/\/www.granma.cu\/cuba\/2024-10-14\/parques-solares-fotovoltaicos-en-cuba-proyecto-basado-en-ciencia-e-innovacion-14-10-2024-23-10-38\"><span style=\"font-weight: 400;\">statements<\/span><\/a><span style=\"font-weight: 400;\">\u00a0to <\/span><i><span style=\"font-weight: 400;\">Granma <\/span><\/i><span style=\"font-weight: 400;\">newspaper, reduced the number of parks that were then \u201cin different stages of construction\u201d to 26, without mentioning start-up dates.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Meanwhile, L\u00e1zaro Guerra, director general of electricity at the MINEM, confirmed that there are actually two projects and extended their time horizon by several years. \u201cThe first project will allow for the installation of 1,000 MW over a two-year period; the second project, with the same generation capacity, should be ready by 2031,\u201d the press release stated, citing the official\u2019s statement.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Since then, official reports have indiscriminately given 2025 and 2026 as the final years for the first project and 2028 and 2031 as the closing date for the second, fueling the confusion. There has even been some journalistic reports suggesting the completion of all 92 parks <\/span><a href=\"https:\/\/lademajagua.cu\/despejando-incognitas-tras-el-despertar-solar-de-la-sabana\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">has been moved up<\/span><\/a><span style=\"font-weight: 400;\"> to next year.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The minister appears to have resolved the inconsistency a few days ago in a lengthy interview with <\/span><i><span style=\"font-weight: 400;\">Granma<\/span><\/i><span style=\"font-weight: 400;\">, in which he attempted to weather the wave of public doubts and questions. De la O Levy, who <\/span><a href=\"http:\/\/www.cubadebate.cu\/noticias\/2024\/12\/19\/ministro-de-energia-y-minas-ofrece-detalles-del-programa-de-recuperacion-del-sen\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">had already announced in Parliament<\/span><\/a><span style=\"font-weight: 400;\"> in December his intention to install 55 parks by 2025, <\/span><a href=\"https:\/\/www.granma.cu\/cuba\/2025-03-25\/podra-recuperarse-totalmente-el-sistema-electrico-nacional-ii-25-03-2025-00-03-16\"><span style=\"font-weight: 400;\">confirmed<\/span><\/a><span style=\"font-weight: 400;\">\u00a0that one of the projects and part of the other, which would extend until 2031, were to be finalized this year.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cIt was always said that it was a contract that would be received in seven years, and that they would arrive in the first year,\u201d the head of MINEM stated regarding the second project. \u201cAlong with that contract, another 1,000 MW contract was signed that would arrive immediately. Therefore, in one year we have the 1,000 MW, plus a \u2018piece\u2019 of the other, one-seventh of the other contract. And in addition, we have others in our country,\u201d he added.\u00a0<\/span><\/p>\n<blockquote class=\"wp-embedded-content\" data-secret=\"yUL6LqSVHf\"><p><a href=\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/\">First solar park connected in project to curb energy crisis in Cuba<\/a><\/p><\/blockquote>\n<p><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"&#8220;First solar park connected in project to curb energy crisis in Cuba&#8221; &#8212; OnCubaNews English\" src=\"https:\/\/oncubanews.com\/en\/cuba\/first-solar-park-connected-in-project-to-curb-energy-crisis-in-cuba\/embed\/#?secret=drgTVSRIGs#?secret=yUL6LqSVHf\" data-secret=\"yUL6LqSVHf\" width=\"500\" height=\"282\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe><\/p>\n<p><b>Until December and until now<\/b><\/p>\n<p><span style=\"font-weight: 400;\">In his interview with <\/span><i><span style=\"font-weight: 400;\">Granma<\/span><\/i><span style=\"font-weight: 400;\">, De la O Levy denied that the overall investment had been delayed due to difficulties in assembling the parks, although he acknowledged delays in the arrival of some components and the complexity of the logistics and construction of these facilities, which, he assured, is progressing according to schedule.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If all goes according to plan, 55 of the 92 solar parks included in the two agreements with China should be installed by the end of 2025. Or at least more than 50, according to Ovel Concepci\u00f3n, director of renewable energy generation at MINEM, who rounded up \u2014 and downplayed \u2014 the number in <\/span><a href=\"http:\/\/www.cubadebate.cu\/noticias\/2025\/03\/20\/se-instalaran-mas-de-1-000-mw-este-ano-con-el-montaje-de-mas-de-50-parques-en-todo-el-pais-video\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">a recent\u00a0<\/span><i><span style=\"font-weight: 400;\">Mesa Redonda<\/span><\/i><\/a><span style=\"font-weight: 400;\"> TV program.<\/span><\/p>\n<p><a href=\"http:\/\/www.cubadebate.cu\/noticias\/2024\/12\/19\/ministro-de-energia-y-minas-ofrece-detalles-del-programa-de-recuperacion-del-sen\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Last December<\/span><\/a><span style=\"font-weight: 400;\">, the minister announced that starting in March, an average of five parks would be operational per month, an estimate reiterated this week by L\u00e1zaro Guerra in <\/span><a href=\"https:\/\/www.facebook.com\/watch\/?v=1368644607504564\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">a television appearance<\/span><\/a><span style=\"font-weight: 400;\">. For his part, President D\u00edaz-Canel <\/span><a href=\"http:\/\/www.cubadebate.cu\/especiales\/2025\/04\/08\/diaz-canel-el-pueblo-cubano-todos-los-dias-esta-dando-lecciones-de-ejemplaridad-y-heroismo-fotos-y-video\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">recently indicated<\/span><\/a><span style=\"font-weight: 400;\"> that by the end of the first half of the year, installed capacity would be 560 MW, which means that 26 parks should be operational by then.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In any case, what official forecasts agree on is that by the end of this year, new parks should total more than 1,000 MW, a significant figure considering that last September, before the commissioning of the first facilities of this project, photovoltaic generation in Cuba only reached 286 MW, <\/span><a href=\"http:\/\/www.cubadebate.cu\/noticias\/2024\/09\/04\/situacion-actual-y-futura-de-le-generacion-electrica-en-cuba-el-ministro-responde-en-la-mesa-redonda\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">according to<\/span><\/a><span style=\"font-weight: 400;\"> Rosell Guerra.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Of that number, by the end of March and so far in April, about 170 MW have been installed, that is, eight parks. To give you an idea, the figure is equivalent to the capacity of the 100 MW Mariel unit, along with a smaller one similar to those at Rent\u00e9 in Santiago de Cuba, <\/span><a href=\"http:\/\/www.cubadebate.cu\/noticias\/2025\/04\/08\/parques-fotovoltaicos-en-cuba-cuanto-aportan-realmente\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">as noted<\/span><\/a><span style=\"font-weight: 400;\"> by the <\/span><i><span style=\"font-weight: 400;\">Cubadebate<\/span><\/i><span style=\"font-weight: 400;\"> website a few days ago.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For now, it is not an impressive figure. The Guiteras and Felton 1 units, the two workhorses of thermal generation in Cuba, each have a larger capacity, exceeding 200 MW, despite the logical limitations due to overexploitation and the longevity of their technology.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The first two parks, in Havana and Cienfuegos, synchronized with the SEN (National Electric Power System) in late February. <\/span><a href=\"https:\/\/oncubanews.com\/cuba\/economia\/crisis-energetica-con-ocho-parques-solares-ya-sincronizados-los-apagones-no-disminuyen\/#:~:text=Las%20nuevas%20instalaciones%20%E2%80%94de%2021,de%20%C3%81vila%20(Ciego%20Norte).\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Six others<\/span><\/a><span style=\"font-weight: 400;\"> did so in the third month of 2025, and none have done so in the fourth month, although at least one of the six connected in March \u2014 <\/span><a href=\"https:\/\/www.invasor.cu\/es\/secciones\/ciencia-y-tecnologia\/cruce-de-la-trocha-primer-parque-solar-de-21-8-mw-de-potencia-en-ciego-de-avila\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">the one in Ciego de \u00c1vila<\/span><\/a><span style=\"font-weight: 400;\"> \u2014 was officially inaugurated in early April.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The operation of these parks, according to authorities, is progressing well. \u201cThe parks have synchronized on the planned dates and are delivering the energy as planned,\u201d <\/span><a href=\"https:\/\/www.facebook.com\/watch\/?v=1368644607504564\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">stated<\/span><\/a><span style=\"font-weight: 400;\"> the general director of electricity at the MINEM. According to Guerra, those eight parks are producing about 1,000 MWh* per day, although that contribution actually fluctuates from day to day \u2014 <\/span><a href=\"https:\/\/www.facebook.com\/share\/p\/1MNjWo4kME\/x8N5-Eu7DgsjAIKkbQB7_aem_eHcrxDzX3SVYrUZACcA5BQ\" target=\"_blank\" rel=\"noopener\"><b>this Thursday<\/b><\/a><span style=\"font-weight: 400;\">, for example, it was only 797 MWh \u2014 and \u201cis not that linear.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Previously, Ovel Concepci\u00f3n <\/span><a href=\"http:\/\/www.cubadebate.cu\/noticias\/2025\/03\/20\/se-instalaran-mas-de-1-000-mw-este-ano-con-el-montaje-de-mas-de-50-parques-en-todo-el-pais-video\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">had stated<\/span><\/a><span style=\"font-weight: 400;\"> that the first two installed parks were operating \u201cvery well\u201d and were generating between 120 and 140 MW. This, he said, had resulted \u2014 around March 20 \u2014 in \u201csavings of more than 1,000 tons of fuel, which have not needed to be used in power generation.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If, in the opinion of the authorities, the installation and energy contribution of the new solar parks is progressing positively, why has their impact not yet been felt in the island\u2019s bleak outlook? Is it just because of their low number so far? Will it be felt at some point? Will the parks be able to contribute beyond daylight hours?<\/span><\/p>\n<p><span style=\"font-weight: 400;\">We will address these concerns in a future article on the topic.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">* MW is not the same as MWh. <\/span><a href=\"https:\/\/www.facebook.com\/share\/19AXAXndLq\/\" target=\"_blank\" rel=\"noopener\"><b>UNE has explained that<\/b><\/a><span style=\"font-weight: 400;\"> the first indicator refers to the capacity to generate or consume energy in one hour. Therefore, the new solar parks can produce up to 21.8 MW per hour each, and combined with the eight already in operation, they can exceed 170 MW in that time.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">On the other hand, MWh is the total energy generated in a given period. In the aforementioned case, that period is one day. Therefore, the 1,000 MWh referred to by L\u00e1zaro Guerra, as he says, represents the combined production of the eight parks on an average workday.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>What does the new solar park project currently underway consist of? What is its real impact on the electric power system? OnCuba offers a first look at the topic.<\/p>\n","protected":false},"author":3261,"featured_media":321159,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[13903],"tags":[23569,29161,19256,34103],"ppma_author":[33550],"class_list":["post-321157","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economy","tag-blackouts-in-cuba","tag-energy-crisis-in-cuba","tag-featured","tag-renewable-energy-sources"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Solar parks vs. blackouts: between illusions and reality (I) | OnCubaNews English<\/title>\n<meta name=\"description\" content=\"What does the new solar park project currently underway consist of? What is its real impact on the electric power system? OnCuba offers a first look at the topic.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Solar parks vs. blackouts: between illusions and reality (I) | OnCubaNews English\" \/>\n<meta property=\"og:description\" content=\"What does the new solar park project currently underway consist of? What is its real impact on the electric power system? OnCuba offers a first look at the topic.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/\" \/>\n<meta property=\"og:site_name\" content=\"OnCubaNews English\" \/>\n<meta property=\"article:published_time\" content=\"2025-04-13T22:18:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/04\/parque-solar-une-1-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1140\" \/>\n\t<meta property=\"og:image:height\" content=\"815\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Eric Caraballoso\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Eric Caraballoso\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/economy\\\/solar-parks-vs-blackouts-between-illusions-and-reality-i\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/economy\\\/solar-parks-vs-blackouts-between-illusions-and-reality-i\\\/\"},\"author\":{\"name\":\"Eric Caraballoso\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/#\\\/schema\\\/person\\\/ab0162526e61405906a4732727689ef7\"},\"headline\":\"Solar parks vs. blackouts: between illusions and reality (I)\",\"datePublished\":\"2025-04-13T22:18:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/economy\\\/solar-parks-vs-blackouts-between-illusions-and-reality-i\\\/\"},\"wordCount\":1414,\"commentCount\":2,\"image\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/economy\\\/solar-parks-vs-blackouts-between-illusions-and-reality-i\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/parque-solar-une-1-1.jpg\",\"keywords\":[\"blackouts in Cuba\",\"energy crisis in Cuba\",\"featured\",\"Renewable Energy Sources\"],\"articleSection\":[\"Economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/economy\\\/solar-parks-vs-blackouts-between-illusions-and-reality-i\\\/#respond\"]}],\"copyrightYear\":\"2025\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/economy\\\/solar-parks-vs-blackouts-between-illusions-and-reality-i\\\/\",\"url\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/economy\\\/solar-parks-vs-blackouts-between-illusions-and-reality-i\\\/\",\"name\":\"Solar parks vs. blackouts: between illusions and reality (I) | OnCubaNews English\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/economy\\\/solar-parks-vs-blackouts-between-illusions-and-reality-i\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/economy\\\/solar-parks-vs-blackouts-between-illusions-and-reality-i\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/parque-solar-une-1-1.jpg\",\"datePublished\":\"2025-04-13T22:18:59+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/#\\\/schema\\\/person\\\/ab0162526e61405906a4732727689ef7\"},\"description\":\"What does the new solar park project currently underway consist of? What is its real impact on the electric power system? OnCuba offers a first look at the topic.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/economy\\\/solar-parks-vs-blackouts-between-illusions-and-reality-i\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/economy\\\/solar-parks-vs-blackouts-between-illusions-and-reality-i\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/economy\\\/solar-parks-vs-blackouts-between-illusions-and-reality-i\\\/#primaryimage\",\"url\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/parque-solar-une-1-1.jpg\",\"contentUrl\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/parque-solar-une-1-1.jpg\",\"width\":1140,\"height\":815,\"caption\":\"Photovoltaic solar park in Cuba. Photo: Taken from the Facebook profile of the Electricity Conglomerate (UNE).\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/cuba\\\/economy\\\/solar-parks-vs-blackouts-between-illusions-and-reality-i\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Solar parks vs. blackouts: between illusions and reality (I)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/\",\"name\":\"OnCubaNews English\",\"description\":\"Revista sobre Cuba\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/#\\\/schema\\\/person\\\/ab0162526e61405906a4732727689ef7\",\"name\":\"Eric Caraballoso\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/oncubanews.com\\\/wp-content\\\/uploads\\\/2015\\\/09\\\/Eric-Caraballosa_avatar_1442265168-96x96.jpg78fa763b15fce7416ea24dbfe94bf6e6\",\"url\":\"https:\\\/\\\/oncubanews.com\\\/wp-content\\\/uploads\\\/2015\\\/09\\\/Eric-Caraballosa_avatar_1442265168-96x96.jpg\",\"contentUrl\":\"https:\\\/\\\/oncubanews.com\\\/wp-content\\\/uploads\\\/2015\\\/09\\\/Eric-Caraballosa_avatar_1442265168-96x96.jpg\",\"caption\":\"Eric Caraballoso\"},\"url\":\"https:\\\/\\\/oncubanews.com\\\/en\\\/author\\\/eric-caraballoso\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Solar parks vs. blackouts: between illusions and reality (I) | OnCubaNews English","description":"What does the new solar park project currently underway consist of? What is its real impact on the electric power system? OnCuba offers a first look at the topic.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/","og_locale":"en_US","og_type":"article","og_title":"Solar parks vs. blackouts: between illusions and reality (I) | OnCubaNews English","og_description":"What does the new solar park project currently underway consist of? What is its real impact on the electric power system? OnCuba offers a first look at the topic.","og_url":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/","og_site_name":"OnCubaNews English","article_published_time":"2025-04-13T22:18:59+00:00","og_image":[{"width":1140,"height":815,"url":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/04\/parque-solar-une-1-1.jpg","type":"image\/jpeg"}],"author":"Eric Caraballoso","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Eric Caraballoso","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/#article","isPartOf":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/"},"author":{"name":"Eric Caraballoso","@id":"https:\/\/oncubanews.com\/en\/#\/schema\/person\/ab0162526e61405906a4732727689ef7"},"headline":"Solar parks vs. blackouts: between illusions and reality (I)","datePublished":"2025-04-13T22:18:59+00:00","mainEntityOfPage":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/"},"wordCount":1414,"commentCount":2,"image":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/#primaryimage"},"thumbnailUrl":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/04\/parque-solar-une-1-1.jpg","keywords":["blackouts in Cuba","energy crisis in Cuba","featured","Renewable Energy Sources"],"articleSection":["Economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/#respond"]}],"copyrightYear":"2025","copyrightHolder":{"@id":"https:\/\/oncubanews.com\/en\/#organization"}},{"@type":"WebPage","@id":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/","url":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/","name":"Solar parks vs. blackouts: between illusions and reality (I) | OnCubaNews English","isPartOf":{"@id":"https:\/\/oncubanews.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/#primaryimage"},"image":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/#primaryimage"},"thumbnailUrl":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/04\/parque-solar-une-1-1.jpg","datePublished":"2025-04-13T22:18:59+00:00","author":{"@id":"https:\/\/oncubanews.com\/en\/#\/schema\/person\/ab0162526e61405906a4732727689ef7"},"description":"What does the new solar park project currently underway consist of? What is its real impact on the electric power system? OnCuba offers a first look at the topic.","breadcrumb":{"@id":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/#primaryimage","url":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/04\/parque-solar-une-1-1.jpg","contentUrl":"https:\/\/oncubanews.com\/en\/wp-content\/uploads\/2025\/04\/parque-solar-une-1-1.jpg","width":1140,"height":815,"caption":"Photovoltaic solar park in Cuba. Photo: Taken from the Facebook profile of the Electricity Conglomerate (UNE)."},{"@type":"BreadcrumbList","@id":"https:\/\/oncubanews.com\/en\/cuba\/economy\/solar-parks-vs-blackouts-between-illusions-and-reality-i\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/oncubanews.com\/en\/"},{"@type":"ListItem","position":2,"name":"Solar parks vs. blackouts: between illusions and reality (I)"}]},{"@type":"WebSite","@id":"https:\/\/oncubanews.com\/en\/#website","url":"https:\/\/oncubanews.com\/en\/","name":"OnCubaNews English","description":"Revista sobre Cuba","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/oncubanews.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/oncubanews.com\/en\/#\/schema\/person\/ab0162526e61405906a4732727689ef7","name":"Eric Caraballoso","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/oncubanews.com\/wp-content\/uploads\/2015\/09\/Eric-Caraballosa_avatar_1442265168-96x96.jpg78fa763b15fce7416ea24dbfe94bf6e6","url":"https:\/\/oncubanews.com\/wp-content\/uploads\/2015\/09\/Eric-Caraballosa_avatar_1442265168-96x96.jpg","contentUrl":"https:\/\/oncubanews.com\/wp-content\/uploads\/2015\/09\/Eric-Caraballosa_avatar_1442265168-96x96.jpg","caption":"Eric Caraballoso"},"url":"https:\/\/oncubanews.com\/en\/author\/eric-caraballoso\/"}]}},"authors":[{"term_id":33550,"user_id":3261,"is_guest":0,"slug":"eric-caraballoso","display_name":"Eric Caraballoso","avatar_url":"https:\/\/oncubanews.com\/wp-content\/uploads\/2015\/09\/Eric-Caraballosa_avatar_1442265168-96x96.jpg","0":null,"1":"","2":"","3":"","4":"","5":"","6":"","7":"","8":""}],"_links":{"self":[{"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/posts\/321157","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/users\/3261"}],"replies":[{"embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/comments?post=321157"}],"version-history":[{"count":2,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/posts\/321157\/revisions"}],"predecessor-version":[{"id":321160,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/posts\/321157\/revisions\/321160"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/media\/321159"}],"wp:attachment":[{"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/media?parent=321157"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/categories?post=321157"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/tags?post=321157"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/oncubanews.com\/en\/wp-json\/wp\/v2\/ppma_author?post=321157"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}